Based on observations of the construction industry and the experiences of waste management companies, several recurring mistakes can be identified that contractors make in the context of waste management. Awareness of these mistakes is the first step to avoiding them:

- Everything thrown into one container - despite new regulations, it still happens that there is no division into fractions on construction sites, and all remnants end up in one place. This practice may result from haste or a lack of containers. However, it is against the law and very short-sighted – mixed waste will still need to be sorted later (which will cost more), and the risk of a financial penalty increases. Solution: provide an adequate number of containers and enforce ongoing segregation.
- Confusing fractions – "dirty" rubble – throwing elements that do not belong into rubble (foil, plastic, wood, gypsum boards). This often results from the mistaken belief that since the container is labeled as "rubble," anything from the renovation can be thrown in. As a result, the entire batch becomes mixed waste unsuitable for aggregate recycling. Employees should be trained to distinguish clean rubble from other waste and be aware of the consequences of mistakes.
- Failure to separate hazardous waste - in the heat of work, it is easy to overlook items such as cans of chemicals, adhesives, or scraps of materials containing harmful substances. It is a mistake to throw them into the nearest container. This results not only in breaking the law but can also contaminate other waste (e.g., spilled paint can soil wood or paper, making them unsuitable for recycling). Conclusion: each hazardous waste should be set aside separately and entrusted to a specialized company for disposal.
- Overloading containers - the desire to save on an additional container or trip can be detrimental – excess packed in forcefully means the container cannot be safely loaded onto a truck or that the load spills during transport. Such a mistake poses a threat to both people and the environment (waste can spill onto the street). It is better to provide an additional container than to risk an accident and a fine.

- Lack of contract or documentation with the waste company - some contractors still arrange waste removal "by phone" with random individuals, neglecting formalities. Later, it turns out there is no KPO confirming the legal transfer of waste, and in case of an inspection, the contractor faces problems. This is a serious mistake – always enter into a written contract with the waste collection company (required by regulations from 2025) and ensure all formalities are completed. In case of any doubts, also keep proof of payment for the service and correspondence – all of this shows that you acted in good faith, handing over waste to a legal partner.
- Ignoring local regulations and PSZOK - sometimes it is forgotten that smaller amounts of construction waste (e.g., a few bags of rubble or renovation leftovers) can be disposed of free of charge at a Selective Municipal Waste Collection Point (PSZOK). Companies should also be aware of local regulations – in some municipalities, it is required to report home renovations and settle waste through PSZOK. It is a mistake to dispose of such waste in regular municipal waste bins or abandon them next to waste shelters. Conclusion: always check what options the municipality offers and inform the client (e.g., the apartment owner) on how to legally dispose of renovation waste.

Awareness of the above mistakes allows you to avoid them. Good industry practice suggests that the key is employee education, clear procedures on the construction site, and cooperation with reliable waste companies. This way, the contractor can successfully meet regulatory requirements, avoid penalties, and operate in an environmentally friendly manner.